Bourbon County Law Enforcement Center
Project Background and Priorities After nearly five years of effort, including consideration of 22 different sites, Bourbon County succeeded in moving ahead with its much-needed Law Enforcement Center and K-9 unit. Solution GGA designed a new 74-bed Law Enforcement Center which could be expanded to 90-beds in the future. The facility included a Sheriff’s Department […]
Buchanan County Courthouse Exterior Restoration
Project Background and Priorities Although some limited repair work on Buchanan County’s historic 1873 Courthouse had been performed on an intermittent basis, this handsome structure badly needed a comprehensive face-lift and restoration. Solution GGA developed bid documents for masonry, cornice and trim repairs, along with replacement of 244 windows, some as tall as 16 feet, […]
Buchanan County Law Enforcement Center Renovations
Project Background and Priorities The Buchanan County Jail consisted of two separate housing units with a capacity of 224-beds. Updates were needed to improve the inadequate ventilation and provide diagnostic space for intake and booking. Solution GGA repurposed an unused indoor activity space to create four padded cells that can be used for observation and […]
Buffalo County Justice Center
Project Background and Priorities Goldberg Group Architects was retained as part of a design-build team to identify and solve existing County Courthouse deficiencies through a comprehensive master plan that successfully addressed long-term administrative, judicial, and detention growth. Solution A design and construction sequence was developed that allowed County services to continue unimpeded through construction. Preparatory […]
36th Street Condo
Project Background and Priorities A group of St. Joseph professionals teamed up to build an office building that would house each of their growing businesses. The building was developed as a condominium association which allowed each business to own its own space while providing the construction cost savings possible with a larger building. The site […]
36th Street Professional Building
Project Background and Priorities A St. Joseph orthodontist retained Goldberg Group Architects to design a professional office building to house her growing orthodontic practice and contain additional office space that could be leased out. The building’s exterior elements match those of the adjacent bank for visual continuity. Each office space has an exterior entrance off […]
Beck Road Professional Complex
Project Background and Priorities Golberg Group Architects had several opportunities to design professional buildings along St. Joseph’s commercial Beck Road. The buildings all share many of the same exterior components such as red brick and cut block, neoclassic columns, and hipped metal roofs.
Brownsberger Professional Building
Project Background and Priorities This building includes a dental clinic and space for two to three additional tenants. Optimizing a sloping site, GGA designed a commercially viable lower-level space off the rear parking backed by a wooded area. Upper-level offices face the front of the site fronting Beck Road. GGA used a residential scale with […]
GGA
520 Francis St., Suite 200C
St. Joseph, MO 64501
1100 Main Street – 4th Floor
Kansas City, MO 64105